header advert
Orthopaedic Proceedings Logo

Receive monthly Table of Contents alerts from Orthopaedic Proceedings

Comprehensive article alerts can be set up and managed through your account settings

View my account settings

Visit Orthopaedic Proceedings at:

Loading...

Loading...

Full Access

Hip

VALIDATION OF PRIMARY METAL-ON-METAL HIP PROCEDURES ON THE NATIONAL JOINT REGISTRY BY THE LONDON IMPLANT RETRIEVAL CENTRE

The British Hip Society (BHS)



Abstract

Introduction

The National Joint Registry (NJR) for England, Wales and Northern Ireland contributes important information on the performance of implants and surgeons. However, the quality of this data is not known. This study aimed to perform an independent validation of primary metal-on-metal hip procedures recorded on the NJR through linkage to the London Implant Retrieval Centre (LIRC).

Patients/Materials & Methods

Primary, metal-on-metal hip arthroplasties performed between 1st April 2003 and 5th November 2013 were recruited from the NJR (n=67045). Retrieved, metal-on-metal components were recruited from the LIRC (n=782). Data linkage and validation checks were performed.

Results

476 procedures (60.9%) on the LIRC were successfully linked to the NJR. However, 306 procedures (39.1%) could not be linked. The outcome recorded by the NJR (as either revised, unrevised or death) for a primary procedure was incorrect in 79 linked cases (16.6%). The rate of registry-retrieval linkage and correct assignment of outcome code improved over time. The rates of error for component reference numbers on the NJR were: femoral head category number 14/229 (5.0%); femoral head batch number 13/232 (5.3%); acetabular component category number 2/293 (0.7%) and acetabular component batch number 24/347 (6.5%).

Discussion

Registry-Retrieval linkage provided a novel means for data validation, particularly for component fields. This study suggests that NJR reports may underestimate revision rates for many types of metal-on-metal hip. This is topical given the increasing scope for NJR data. We recommend a system for continuous, independent evaluation of NJR data quality and validity.